top of page
Silo Foundation for BMK-Steinbruch
In this project, the formwork and reinforcement plans for the foundation of a buffer silo were created. The foundation is 140 cm high, while the pedestals supporting the steel columns of the silo are 150 cm high. Connecting beams are placed between the concrete pedestals to contribute to the stability of the structure.



bottom of page